PROGRESS REPORT ON 37 POINTS (HIMSWKANG) SPECIAL TRIBAL DEVELOPMENT PACKAGE OF SOUTH TRIPURA DISTRICT   UPTO THE MONTH   APRIL 2005. 

 

 

Points

Details

Achievement

A

B

C

 

EDUCATION

1.

All the Junior Basic Schools in TTAADC area, which do not have any pucca building at present, would be provided with pucca buildings by the year 2006-07.

During the year 2003-04.

During the year 2004-05

Name of scheme

Target

Achievement          

In -progress

Remarks

IO /Name of Scheme

Target

Achievement        

In progress

SSA- 

27

17

10

 

Dy. Dir. Edu- ADC (SSA)

                      - (NLCPR)

41

24

7

-

34

-

SSA (Addl Class room)-

37

24

13

 

BDOs –             (SGRY)

                          (PMGY)

26

6

18

-

8

6

NLCPR

2

1

1

 

TTAADC- NLCPR

PMGY (SSA)

6

6

2 nos. tender under process. 4 nos. work order just issued. Under NLCPR). Materials collection for 3 nos.  Trench work completed for 1 no. & Site change proposal for 2 nos. under PMGY.

SGRY

16

16

0

 

Total:-

94

58

24

 

Total: -

97

25

48

2.

Furniture will be supplied to the J.B. Schools in TTAADC areas in a phased manner and teaching aids will be supplied to all the J.B. Schools in TTAADC areas, which are not presently supplied with teaching aids.

2003-04 & 2004-05= 50 JB School are opened in TTAADC area under SSA. Accordingly an amount of Rs. 10,000 had already been given to each school for purchasing of Teaching learning materials.  Reported by Dy. Director, Education, South.

 

TTAADC (RPC, Sabroom)- Total number of school- 104 JB Schools, Requirement of furniture- 2940 nos.

TTAADC (Chellagangmukh, Amarpur) -Total number of school- 21 JB Schools, Requirement of furniture- Chair- 96, Table- 87, Joint benches - 710 nos.

TTAADC (BC Manu, Belonia)- Total number of school- 72 JB Schools, Requirement of furniture- Chair- 355, Table- 353, Joint benches - 1609 nos.

TTAADC (Raiyabari, Udaipur)- Total number of school- 73 JB Schools, Requirement of furniture- Chair- 133, Table- 134, Joint benches - 347 nos. Long bench- 280, Black board- 145, Almirah- 56.

TTAADC (Ampi, Udaipur)- Total number of school- 58 JB Schools, Requirement of furniture- Chair- 102, Table- 102, Joint benches - 1093 nos., Alminah- 42 nos.

3.

Drop-out ratio for Scheduled Tribes students in general and girl students in particular, at Madhyamik stage will be brought down by at least 40% from the existing level.

TW Deptt= 2003-04= 14 Drop-out Coaching Centers, Total- 467 Students.

 

TW Deptt =2004-05= Proposal send to TW Deptt total- 8 Drop-out Coaching centers.  6 Drop-out Coaching centers approved. Total- 193 students.  2 Drop-out Coaching centers not yet approved. Total- 66 students. Grand total- 259

2004-05= Spl. Coaching center in core subject under South Tripura District- Total – 8 nos. centers, Total students- 1,064

Edn Deptt= 2003-04 & 2004-05=Dy Director, Education informed that there are 9,405 unenrolled children in TTAADC areas. The drop out rate from Class I to Class V is 19 % and 31% from Class VI to Class VIII. Efforts shall be made to target all the indentified unenrolled shildren.    

4.

Science stream at the Higher Secondary level in the Higher Secondary Schools in TTAADC areas will be started in minimum 10 Schools as under: 2004-2005= 3 Schools, 2005-2006= 3 Schools, 2006-2007= 4 Schools.

Proposal sent to Director TW regarding starting science stream in Tribal areas vide dt 11/11/03 namely i. Ompi Class-XII School ii. Gamaria Class-XII School, iii. Birchandra Sahid Smriti Class-XII School iv. Gardhang Class-XII School v. Bankul Class-XII School. Total – 5 Schools. 

2003-04= Name of School Ompi HS school science stream already started.

2004-05= Dy. Director, Education, South, Proposal sent earlier regarding Gamaria Class-XII School, Birchandra Sahid Smriti Class-XII School, Gardhang Class-XII School should also be pursued.     

5.

All the Junior Basic Schools in TTAADC areas not having safe drinking water source and sanitation facilities will be provided with water and sanitation facilities.

For 2003-2004- 111  JB Schools have been covered for safe drinking water sources under PMGY (DW) , SSA & PM’s announcement .  

 

For 2004-2005- PM’s announcement total 95 Schools for providing drinking water facility under the scheme. Total 53 Schools completed. Total   42 schools in progress.  

 

                           22 JB Schools is target to be covered for providing sanitation facilities during 2004-05 under SSA.  22 JB schools completed.  

6.

Two more Residential Schools for tribal students would be set up in Sabroom and Khowai Sub-Division to offer high standard of education and these Schools would be managed by the Tripura Tribal Welfare Residential School Society under the Tribal Welfare Department.

Foundation stone has been laid on 10/01/2005 in EMRS at Bhuratali, Sabroom, South Tripura.  Expenditure sanction for Rs. 25.00 lakhs received and has been placed with EE RD, South.  Total land measuring 29.49 acres.   Work order issued. RD materials booked.

7.

Coaching for Joint Entrance Examination will be conducted in all District

2003-04= No centre functioned in South Tripura District.

2004-05= Name of Centre- Langmani Haduk Society, Udaipur (NGO). No. of students enrolled- 11, Date of commencement- 01/12/04. Duration of period- 4 months (October 2004 to January 2005). Approval from TW Deptt received on 16/12/2004.

8.

One new ITI shall be opened at Ambassa and the ITI at Jatanbari shall be upgraded.

2003-04= Nil

2004-05=Land for new construction of ITI Jatanbari has been handed over to PWD, Amarpur, Division No.1. on 15.10.2004 and the  construction work is yet to be  started by the concerned Department.

2005-06= Construction work has not yet been started.

 

9.

Posting of adequate number of teachers in all schools in ADC areas will be given priority.

Total – JB School= 350. Total new JB School- 50, No.  of Teacher- 1,296 ( Regular- 1205 + Contract basis- 91) , Total no. of students- 36,121, No. of single teacher in school- 59.   

10.

Literacy campaign will be activated as a major thrust area for achieving cent percent literacy among tribal.

Out of 22,206 ST learners, 16,225 have succeeded. 

  

A

B

C

 

HEALTH

11.

Construction of buildings for Health Institutions (PHCs and Sub-Centres) located in tribal areas will be given priority. Health Deptt. shall taken up construction of buildings for 10 Institutions each year.

As reported by CMO, South

Year

Target

Name of Sub-Centre

Renovation of bulilding.

W. in progress

W. Completed.

2003-04

4

i. Sachirambari (BLN) ii. Shamukcherra (UDP)

i. Takmacherra (BLN) ii. Debipur (BLN).

-

-

2

2

-

2004-05

2

i. Manirambari (BLN) ii. Dumbur nagar ousted Colony (AMP)

i. Karbook PHC (AMP), ii. Shilachari PHC (SBM), iii. Ompi R/H (AMP) iv. Natunbazar R/H (AMP)

-

4

-

4 W. under progress.

-

-

2005-06

-

i. Tairupabari (BLN), ii. Kalachara PHE (SBM)

2

 

 

12.

At least 5 local tribal women in each village the TTAADC area shall be given Dhai training for ensuring safe deliveries.

 As reported by CMO, South

Year

Target

Achievement

Remarke

2003-04

55

-

Proposal sent to Director (DHS) Agartala for Dhai training. Approval yet to be received.

2004-05

99

 

Fund sanction and distributed towards 10 of selected PHCs under South Tripura for Dhai training of Tribal Women (5 women from each villages) Total fund sanction for 100 persons. Training to be completed by March 2005.     

13.

Immunization will be taken up in tribal areas in a big way to achieve 100 percent coverage among the children and pregnant mothers.

As reported by CMO, South

Year

Target

Name of Block

Remarks

2003-04

4

i. Matabari ii. Sstchand iii. Amarpur iv. Hrishyamukh

100% immunization completed.

2004-05

7

i. Rupaichari ii. Rajnagar, iii. Kakraban, iv. Matabari v. Satchand vi. Hrishyamukh vii. Amarpur

100% immunization completed

2005-06

4

i. Karbook, ii. Killa, iii. Ompi, iv. Bagafa.

100% immunization is going on and will be completed by August 2005

 

INFRASTRUCTURE

14.

All the 291 Partially Covered Habitation (P.C. Paras) as on 01/04/2003 in tribal areas will be upgraded to Fully Covered Habitations (F.C. Paras) by providing additional sources of drinking water.

2003-04= Thiere is no NC/ PC habitation as on 01-04-2004. All are FC habitation.   

          

Coverage of NC/PC habitations in Tribal areas during 2004-05.

Status of NC/PC habitations in tribal areas after conducting re-survey of drinking water sources during 2004-05 (in nos.)

Taken up during 2004-05 (in nos.)

Converted to FC during 2004-05 (in nos)

 Action plan during 2005-06 (in nos.)

 

NC

PC

NC

PC

NC

PC

Converted

In prog.

Converted

In prog.

NC

PC

215

227

125

31

73

52

11

20

90

196

15.

Minimum 40% of new Pipe water supply schemes/Iron Removal Plants shall be taken up in tribal areas.

PHE Division No. III, Udaipur

PHE, Division no. VII, Belonia.

Year

Target

Phy. Achievement

Year

Target

Phy. Achievement

Futher contemplated 2005-06

2004-05

i. Pipe water supply-  12.60 KMs

ii. Iron Removal plants-10 nos

iii.  Sinking D.T.W - 24 nos. 

iv. Over head Tank- 3.

i. Pipe water supply- 8.223 KMs

ii. Iron Removal plants-6 in progress.

iii. Sinking D.T.W – 13 nos.

iv. Over head Tank-1 in progress.

2004-05

i. Pipe line - Nil

ii. Iron Removal plants- 7 nos

iii. D.T.W scheme- 25 nos.

iv. Over head Tank-3 nos.

i. 36,203 Mtrs completed.

ii. 7 nos. Work in progress.

iii.  Production well-13, Abodant-5

iv.  Over head Tank-3 Work in progress.

-

-

7 nos. 

-

16.

Area Based integrated projects shall be taken up in minimum 10 identified tribal villages to accelerate growth.

4 Spl. Area Based Projects have been taken up in South Tripura District. Details are as follows:

Sl. No

Name of projects

No. of targeted families.

Name of Sub-Div

Fund allotted for Area Based Project (In Rs.)

Expenditure (In Rs.)

1.

Dakshin & Uttar Songang

574

AMP

 32,90,125

 22,16,005

2.

South Barmura

595

UDP

23,40,000

18,39,880

3.

Laxmichara

471

BLN

19,60,275

18,91,000

4.

Gagan Chandra Para

381

SBM

26,75,000

20,28,000

Total: -

2,021

 

1,02,65,400

79,74,885

17.

At least 5,000 hectares of irrigation potential would be created in tribal areas through the Minor Irrigation Schemes during the next 4 years.

Udaipue I & FM

2003-04- 649 Hec

Belonia I & FM

 2003-04 & 2004-05= 1,162 Hect. Covered. (up to Dec 04).

RD Deptt

2004-05= Target- 1020.70 Hect.

2004-05 = i. Total number of LI scheme taken up under TSP of MTB, Killa, AMP, KBK & Ompi Block- 33 nos.

ii. Commissioned- 17 nos.

iii. Ready for commission- 16 nos.

iv.  Power connection-2

v. Pipe line completed- 56.134 KM

vi. Land brought under irrigation-267.00 Hec

 

A

B

C

18.

The Power Deptt would electrify at least 300 backward tribal habitations not having electricity at present and at least 100 habitations would be covered by non-conventional source of power by the Science and technology Deptt.

Power Deptt.

Science & Technology Deptt.

Name of Division

Target

Year

Name of village

Line parameters

Status

Year

Name of GP

No. of covered family

Remarks

HT

LT

S/S

2003-04

South Baramura, Killa Block

230

All these villages are electrified through solar home lighting system

EE. ED-IV, UDP

3

2003-04

1.Rathuapara (Noapitrabari) under Dewanbari (Uttar Brajendranagar)

3 KM

1 KM

1x25 KVA

Pole erection Completed

2.Darlong Jamatiabaripara (Senaraibari) under Uttar Changang (Tuichakma)

1.5 KM

1.5 KM

1x25 KVA

Completed

Darjeeling Bari, Killa Block

93

3. Rambabu Kalaipara (Besreempara) underDakshin Taidu.

0.3 KM

1.5 KM

1x25 KVA

Completed

Magroom, Rupaichari Block

83

EE. ED-IV, UDP

3

2004-05

1. Tuibaklaibari (Raiyabari Chaprai) under Uttar Baramura (Raiyabari)

1.5 KM

1 KM

1x25 KVA

Estimate is being sent to higher authority for necessary approval

East Manu Bankul,. Rupaichari Block

72

2. Chaimani Roy Kaipeng (Ompi Khasrung para)-Regrouping colony under Uttar Taidu

1.5 KM

1 KM

1x25 KVA

Estimate is being sent to higher authority for necessary approval

Bagmara Rupaichari Block

51

3. Bampur Jamatiabari Karfubari IJS colony (Laigiri) under Bampur.

1.5 KM

1 KM

1x25 KVA

Estimate is being sent to higher authority for necessary approval

Kaptali Rupaichari Block

137

EE,ED-VI, Bagafa

2

2004-05

1. Khastilla under Manpathar GP

-

-

-

Target of line parameter not yet received.

Bagachata Rupaichari Block

39

2. Bagantilla under Kailashnagar GP

-

-

-

Target of line parameter not yet received.

Bishnupur Rupaichari Block

36

Taikuma  STC Block

68

Ratanmani, STC Block

10

Betaga STC Block

10

Habratali STC Block

10

2004-05

 Kachigang, Killa

52

These villages are electrified through Solar Photovoltaic power plant

Colony Para, STC Block

46

Sen Chandra Para, RPC Block

49

2005-06- Target

 

 

 

Dakshin Baramura/Debtamura R.F. Killa Block.

600

These villages will be electrified through solar home lighting system

Kaptali, RPC Block.

361

Baramura, Killa Block

330

Jarimura, Karbook Block

588

Mukchari Karbook Block

26

Chakpur Karbook Block

38

 

A

B

C

19.

The Animal resource Development infrastructure will be strengthened in Tribal Areas.

As reported by Dy. Director, ARDD, South

Year

Target

Remarks

2003-04

4 Opening of new Vety First Aid centre.

4 Opening of new Vtcy First Aid centre and started functioning. Namely- i. Kaptali VFAC under Rupaichari Block. ii. Takka Tulshi VFAC under Satchand Block. iii. Pathaimegpara VFAC under Satchand Block iv. Kalacharra VFAC under Bagafa Block.

2004-05

6 Proposals for the A.I. coverage VFAC. 1 Opening Block level Vety. Institution. 

i. Proposal for the A.I. coverage VFAC- 6 nos. Progress during Awaiting for approval. Namely- i. Nityabazar (New Centre) under Killa Block. ii. South Baramura (New Centre) under Killa Block. iii. Karbook under Karbook Block iv. Atharabhola under Killa Block v. Tainal/ Adipur under Matabari Block vi. Gamekobari under Amarpur Block.

ii. Opening Block level Vety. Institution at Killa.- 1no.   Progress during Awaiting for approval.

20.

Two Commercial handloom Production Units on loin loom shall be taken up as Pilot Projects.

Handloom, Sericulture & Handicraft based Special SGSY projects were taken up in Bagafa Block. 400 ST beneficiaries are to be covered. (  75 Handloom +  250 Sericulture + 75 Handicraft)

21.

 

 

All habitations having at least 250 populations in rural areas will be provided roads of improved quality by 2007 based on Core road Network Plan.

Status reports on Core road Netwoek Plan under South Tripura District.

Sl. No

Name of road

Road number as per core network

Required length of road (In KM)

Habitations of population 250 and above covered

Habitations of population below 250   covered incidentally (on route)

Remarks

1

2

3

4

5

6

7

Rupaichari Block, Sabroom Sub-Division.  As reported by EE, Roads & Building Division (PWD) Sabroom.

1.

Silachari Ailmara main road to Anandabandu para

L 023

3.75

i. Gajennda Para ii. BSF Camp iii. Anandabandhu para.

 

 

2.

Silachari Ailmara main road to Ramsing para

L 024

0.70

i. Ramsing Para

 

 

3.

Silachari Ailmara main road to Potachari

L 025

5.25

i. Joyanta Para, ii. Akya mog Para, iii. Mankarbari.

 

 

4.

Silachari Ailmara main road to Desharam Khamar para

L 026

3.00

i. Desharam Khamar para

 

 

5.

Silachari Ailmara main road to Thakia Chow. Para

L 048

1.40

i. Thakia Chow. Para

i. Labrachai Para

 

6.

Naibodya para to Asla Ch. Para

L 041

1.40

i. Ash Ch. Para

 

 

7.

Harina to South Manu Bankul Bazar

L 044

2.00

i. South Manu Bankul Bazar

i. Narayanbari.

 

8.

Narayanbari. To Santipalli

L 045

3.10

i. Bankul Colony, ii. Santipalli

i. Nandu Kr. Para, ii. Chota Mog para, iii. Maever para, iv. Magath para, v. Mongari mog Para, vi. Sudhan Chow. Para. 

 

9.

Thini Mog para to Deang Chow Para.

L 046

1.60

i. Deang Chow Para, ii. Gobinda Para

i. Safru Mog para, ii. Thini Mog Para.

 

10.

Harina Ailmara main road to Mongru Mog Para

L 049

7.85

i. Padmalochan para, ii. Chalafru Mog para, iii. Mongru Mog para

i. Kirit bahar para, ii. Balidar para, iii. Sabiram para, iv. Chalai Mog para.

 

11.

Chalafru Mog para to ramrai para

L 050

2.20

i. Ramrai para

i. Mongari Mog Para.

 

12.

Kirit bahar para to Haridas Para

L 052

2.80

i. Haridas Para

i. Kanya prasad para, ii. Dema Prasad para.

 

13.

Harina Ailmara main road to Jogendra para

L 056

1.00

i. Jogendra para

 

 

14.

Harina Ailmara main road to Abhi roaja para

L 057

2.75

i. Abhi roaja para

 

 

15.

Harina Ailmara main road to Kejuri Mog para

L 058

1.00

i. Subarna para, ii. Kejuri Mog para

 

 

16.

Harina Ailmara main road to Maria para

L 059

1.00

i. Maria para

i. Ailmara bazar

 

17.

T02 to Bagmara para

L 030

1.20

i. Bagmara para

 

 

18.

T02 to Khirod roaja para

L 032

1.00

i. Khirod roaja para

 

 

19.

Harina Ailmara main road to Daluchari para

T 02

1.20

i. Daluchari para, ii. Anandabandu para.

 

 

20.

Baishnabpur to Beltali

T 02

10.00

i. Sidhi Singh para, ii. Beltali

i. Kukichara, ii. Kassampara, iii. Trikumarpara,iv. Pitra Chakma para, v. Mongi Mog para, vi. Gugra Para.

 

21.

Silachari Ailmara main road to Debendra para

L 022

6.25

i. Gunamani para, ii. Mongfru Mog Para, iii. Debendra para.

i. Lalit para.

 

Total:-

60.45 KMs

 

 

 

 

A

B

C

 

 

1

2

3

4

5

6

7

Satchand Block, Sabroom Sub-Division. As reported by EE, Roads & Building Division (PWD) Sabroom.

1.

US road (Laban Roaja para) to Kalijoy Roaja para

L 021

5.40

i. Kalijoy Roaja para

i. Das para,ii. Ponichandra para, iii. Sadhan Chandra para.

 

2.

US road (Gariya Sardar para) to Ramjiban para.

L 022

5.30

i. Ramjiban para.

i. Garya Sardar para ii. Takun Bazar, iii. Lazmibari para, iv. Hari Das Roaja para, v. Gukul Roja para

Brick soling road as per PWD Tripura specitication without proper C.D.work.

3.

US road (Kala chara) to Golakhan para

L 023

3.90

i. Annadhan para, ii. Golakhan para

i. Gabinda para, ii. Ramkrishna para, iii. Sen chandra para.

 

4.

L 023 (Kalachara to Golakdhan para) to Chagra para

L 025

2.70

i. Kongchai para, ii. Chagra para

i. Ram Goya para,ii. Dakshin para, iii. Das para

 

5.

US road (Near EPM Bazar) to Pathi Mog para

L 027

2.90

i. Pathi Mog para

 

 

6.

US road (Satchand Block) to Surendra Sarder para.

L 059

4.00

i. Surendra Sarder para, ii. Mougsingh para 

i. Pichan Das para, ii. Mantu Das Para, iii. Tafmonas para, iv. Nandyran para, v. Dakshin para, vi. Uttar para, vi. Madhya para, vii. Ratan vadya para, viii. Gakul Roaja para,

 

7.

L 059 (New Manu ONGC coloney to Ratan Vaidya para) to Kabya chow para.

L 060

0.60

 

i. Kabya chow.Para, ii. Prassana roaja para, iii. Binysarkar para, iv. Maniram para, v. Ram ch.para,

 

8.

U.S. road (Das para) to poang bari.

L 061

4.85

i. Krishna Choudhuri para, ii. Mongsing para, iii. Poang bari.

i. Ram Guyacolony, ii. Das para, iii. Dhirendra Nath para, iv. Nath para, v. Sil para, vi. Gardhang para.

 

9.

T 02(Near Joysingh para) to Ramar bari.

L 047

6.20

i. Kaptali Maru Ramar bari.

i. Bartilla para, ii. Maru para,

 

10.

L 047(Near panigata para) to Maru para.

L 044

0.60

 

i. Maru para.

 

11.

T 02(Powang bari) to Sarat Chandra para.

L 048

1.80

i. Sarat Chandra Para.

 

 

12.

L 054(Badal sil para) to Arjun prasad para.

L 056

1.60

i. Arjun prasad para, ii.Nitai charar para.

i. Basanti para.

 

13.

T 02(Bhudhi Mangal para near Manu hospital) to Rabindra Sardar para,

L 057

1.26

i. Bhudhi Mangal para, ii. Rabindra Sardar para.

i. Gagan Bari.

 

14.

U.S. road(Lalit para Manu bazaar) to Astam sardar para.

T 03

2.85

i. Astam Sardar para.

i. Dakhin Manu Shiki Ram para.

 

15.

T 03(Mahimsardar para) to Kakai Mogh para.

L 053

2.75

i. Dinesh Majumder para, ii. Kaki Mog para.

i. Mahim sardar para.

 

16.

T 03(Dhupchari) to Mandali para.

L 042

2.85

i. Mathu Mog para, ii. Mandali para.

i. Dup Charri.

 

17.

T 03(Sikhirampara) to Sabal para.

L 051

4.00

i. Nath para, ii. Bipin Sardar para, iii. Sabal para.

i. Nul singh para, ii. Chandi Roaja para, iii. Chan Frau para.

 

18.

U.S. road(Manughct) to Kushal Ch. Para.

T 04

11.00

i. Shyam para, ii. Harbatali para, iii. Kushal para.

 

Out of total 11.ooKm. and 1.5Km. Brick soled as per PWD Tripura spectication. Estimate sent for 5.9Km. under PMGSY scheme for 2002-03.

19.

T 04(Sadroom Nabin Ch.para) to Banga Mura.

L 043

3.50

 

i. Nal charri

 

20.

U.S. road(Kathal Chari para) to Mog para.

L 031

2.00

i. Kathal Charri para, ii. Dakshin para, iii. Bijoy sil para, iv. Mog para.

i. West para.

 

Total

70.00 KMs

 

 

 

 

A

B

C

 

 

1

2

3

4

5

6

7

Bagafa Block, Belonia Sub-Division. As reported by EE, Southern Division No.-II  (PWD) Santirbazar.

1.

T-13(NH-44) to Tuipang para

L 021

5.00

Tuipang Para (P=268)

i. Nagendra Para(P=100), ii. Kupilong Noatia Para (P= 217), iii. Saran Kr. D/Barma Para (P=174), iv. Sachindra Noatia Para (P=103)

 

2.

T-01 (NH-44-Takma road) to Lal Tilla Mog para

L 023 & L 024

3.50

i. Lal Tilla Mog para (P=311)

i. Rabindra Para (P=103) ii. Bishnu Noatia para (P=140), iii. Karai Ch. Para (P=224) iv. Mahabasi para (P=130).

B/S shown in CN but not as per Specification.

3.

T-01 (NH-44-Takma Road) to Mongshu Mog para.

L 025

3.00

i. Monghu Mog para (P=308)

ii. Madhu Chakma para (P=305)

i. Sonatan para (P=86),ii. Guna Sigh para (P=90) iii. Sambhu Hari para (P=102) iv. Khutum Rai Reang para (P=114).

 

4.

T-13 (NH-44) to Pati Prasad Para.

L 029

5.00

i. Pati Prasad Para (P=302).

i. Larcha Para (P=184), ii. Mandata Para(P=215),iii. Gangaria Para (P=188).

 

5.

Pati prasad para to Tashriaha para.

L 030

2.00

i. Tashriaha para (P=533).

 

 

6.

T-02 (A-B Road) Bagafa Ashram Para to Gobin Bari.

L 035

4.00

i. Gobin Bari (P=250), ii. Lankajoy Para (P=297).

i. Anuram Para(P=244).

 

7.

T-03(Baikhora-Laxmicherra Road) to Sarbadhan para.

L 037

2.00

i. Sarbadhan para (P=250).

i. Rajendra para (P=33).

 

8.

T-03 (Baikhora-Laxmicherra Road) to Desharai para.

L 038

5.00

i. Desharai para (P=279).

i. BirchandraPara (P=103), ii. Muktadhan para (P=60), iii. Athoi Mog para (P=101), iv. Chulaibari (P=203).

2.00Km. -2.50Km. Brick soled with 3 nos. S.P.T.bridge.

9.

T-03 (Baikhora-Laxmicherra Road) to Gridya Kr. Para.

L 039

8.00

i. Gridya Kr. Para (P=250), ii. Khedachandra para (P=545).

i. South Binoy Prasad para (P=116), ii. Raiyabari (P=158), iii. Purbajoy para (P=164), iv. Ganiram para (P=176), v. Dingha para (P=52), vi. Debendra para (P=95).

 

10.

T-04(Kalshimukh-Kalshi Road) to Najirai para.

L 044

2.00

i. Najirai para (P=355), ii. Charen para (P=507).

 

 

11.

T-04(Kalshimukh-Kalshi Road) to Madhumog para.

L 045

2.00

i. Madhumog para(P=357).

i. Puipaha para(P=138).

 

12.

Madhumog para(Sisarai) to Satarai para.

L 048

1.50

i. Satarai para(P=298)

 

The connecting road i.e.L 047 with the main road is under const. under PMGSY scheme during the year 2001-02.

13.

Satarai para to Sisarai.

L 049

3.00

i. Sisarai(P=250)

 

 

14.

Sisarai to panjirai.

L 050

3.50

i. panjirai(P=1005).

 

 

15.

T-05(Jolaibari-Kowaifung Road) to Rangacherra para.

L 054

1.50

i. Rangacherra para (P=756).

 

 

16.

T-05(Jolaibari-Kowaifung Road) to Rabidhan para.

L 055

7.02

i. Rabidhan para(P=289).

i. Harijoy Colony (P=180).

 

17.

T-05(Jolaibari-Kowaifung Road) to Patichari.

L 059 & L 056

5.00

i. Patichari(P=411).

i. Shibram Mog para(P=159).

 

18.

L 056(Patichar-Nath para Road) to Shinglufru Mog para.

L 057

1.25

i. Shinglufru Mog para (P=338).

 

 

19.

L 056(Patichar-Nath para Road) to Nabaram Para.

L 058

2.00

i. Nabaram Para (P=314).

 

 

20.

T 05(Jolaibari-Kowaifung Road) to Chandramal para.

L 060

2.00

i. Chandramal para(P=272).

i. Narad para(P=67)

Brick soled shown in CN but not as per specification.

21.

Chandramal para to Surendra Chow.para.

L 061

5.00

i. Surendra Chow.para .(P=281).

i. Charan Singhpara(P=245), ii. Arjun Para(P=85), iii. Ananta Sardar para (P=219).

Brick soled shown in CN but not as per specification.

22.

T-05(Jolaibari-Kowaifung Road) to Teja Bari.

L 062

3.00

i. Teja Bari (P=497).

i.Parba Bari(P=135).

 

 

A

B

C

 

 

1

2

3

4

5

6

7

23.

Teja Bari to Sukul Bari.

L 063

3.00

i. Sukul Bari (P=365).

i. Rabi Bari(P=76),ii. Sona Bandhu para(P=39),iii. Gita Mohan para(P=221).

 

24.

T-13(NH-44) to Durba Ch.Roaja para.

L 066

4.50

i. Durba Ch.Para (P=258), ii. Charfu Mog para(P=303)

i. Nagendra para(p=116), ii. Natun Ch. Para(P=134).

 

25.

Durba Ch.Roaja para to Chelafu Mag para.

L 067

3.00

i.Chelafu Mag para(P=301)

i. Krishnadhan Sardar para (P=116), ii. Sondhan para (P=69).

 

26.

T-13(NH-44) to Sachiram para.

L 068

2.50

i. Sachiram para (P=574)

 

 

27.

T-13(NH-44) to Jumirai para.

L 070

3.00

i. Jumirai para (P=355)

i. Ganga Charan para(P=147).

 

28.