PROGRESS REPORT ON 37 POINTS (HIMSWKANG) SPECIAL
TRIBAL DEVELOPMENT PACKAGE OF SOUTH TRIPURA DISTRICT UPTO THE MONTH APRIL 2005. |
|
Points |
Details |
Achievement |
||||||||||
|
A |
B |
C |
||||||||||
|
|
EDUCATION
|
|||||||||||
|
1. |
All
the Junior Basic Schools in TTAADC area, which do not have any pucca building
at present, would be provided with pucca buildings by the year 2006-07. |
During the year 2003-04. |
During the year 2004-05 |
|||||||||
|
Name of scheme |
Target |
Achievement |
In
-progress |
Remarks
|
IO /Name of Scheme |
Target |
Achievement |
In
progress |
||||
|
SSA- |
27 |
17 |
10 |
|
Dy. Dir. Edu- ADC (SSA) - (NLCPR) |
41 24 |
7 - |
34 - |
||||
|
SSA (Addl Class room)- |
37 |
24 |
13 |
|
BDOs – (SGRY) (PMGY) |
26 6 |
18 - |
8 6 |
||||
|
NLCPR |
2 |
1 |
1 |
|
||||||||
|
TTAADC- NLCPR PMGY (SSA) |
6 6 |
2 nos. tender under
process. 4 nos. work order just issued. Under NLCPR). Materials collection
for 3 nos. Trench work completed for
1 no. & Site change proposal for 2 nos. under PMGY. |
||||||||||
|
SGRY |
16 |
16 |
0 |
|
||||||||
|
Total:- |
94 |
58 |
24 |
|
Total: - |
97 |
25 |
48 |
||||
|
2. |
Furniture
will be supplied to the J.B. Schools in TTAADC areas in a phased manner and
teaching aids will be supplied to all the J.B. Schools in TTAADC areas, which
are not presently supplied with teaching aids. |
2003-04 & 2004-05= 50
JB School are opened in TTAADC area under SSA. Accordingly an amount of Rs.
10,000 had already been given to each school for purchasing of Teaching
learning materials. Reported by Dy.
Director, Education, South. TTAADC (RPC, Sabroom)-
Total number of school- 104 JB Schools, Requirement of furniture- 2940 nos. TTAADC (Chellagangmukh, Amarpur) -Total number of school- 21 JB Schools, Requirement of furniture-
Chair- 96, Table- 87, Joint benches - 710 nos. TTAADC (BC Manu, Belonia)-
Total number of school- 72 JB Schools, Requirement of furniture- Chair- 355,
Table- 353, Joint benches - 1609 nos. TTAADC (Raiyabari, Udaipur)-
Total number of school- 73 JB Schools, Requirement of furniture- Chair- 133,
Table- 134, Joint benches - 347 nos. Long bench- 280, Black board- 145,
Almirah- 56. TTAADC (Ampi, Udaipur)-
Total number of school- 58 JB Schools, Requirement of furniture- Chair- 102,
Table- 102, Joint benches - 1093 nos., Alminah- 42 nos. |
||||||||||
|
3. |
Drop-out
ratio for Scheduled Tribes students in general and girl students in
particular, at Madhyamik stage will be brought down by at least 40% from the
existing level. |
TW Deptt= 2003-04= 14
Drop-out Coaching Centers, Total- 467 Students. TW Deptt =2004-05= Proposal
send to TW Deptt total- 8 Drop-out Coaching centers. 6 Drop-out Coaching centers approved.
Total- 193 students. 2 Drop-out
Coaching centers not yet approved. Total- 66 students. Grand total- 259 2004-05= Spl. Coaching
center in core subject under South Tripura District- Total – 8 nos. centers,
Total students- 1,064 |
||||||||||
|
Edn Deptt= 2003-04 & 2004-05=Dy Director, Education informed that there are 9,405 unenrolled
children in TTAADC areas. The drop out rate from Class I to Class V is 19 %
and 31% from Class VI to Class VIII. Efforts shall be made to target all the
indentified unenrolled shildren. |
||||||||||||
|
4. |
Science
stream at the Higher Secondary level in the Higher Secondary Schools in
TTAADC areas will be started in minimum 10 Schools as under: 2004-2005= 3
Schools, 2005-2006= 3 Schools, 2006-2007= 4 Schools. |
Proposal
sent to Director TW regarding starting science stream in Tribal areas vide dt
11/11/03 namely i. Ompi Class-XII School ii. Gamaria Class-XII School, iii.
Birchandra Sahid Smriti Class-XII School iv. Gardhang Class-XII School v.
Bankul Class-XII School. Total – 5 Schools.
2003-04= Name of School
Ompi HS school science stream already started. 2004-05= Dy. Director,
Education, South, Proposal sent earlier regarding Gamaria Class-XII School,
Birchandra Sahid Smriti Class-XII School, Gardhang Class-XII School should
also be pursued. |
||||||||||
|
5. |
All
the Junior Basic Schools in TTAADC areas not having safe drinking water
source and sanitation facilities will be provided with water and sanitation
facilities. |
For
2003-2004- 111 JB
Schools have been covered for safe drinking water sources under PMGY (DW) ,
SSA & PM’s announcement . For
2004-2005- PM’s announcement total 95 Schools for providing
drinking water facility under the scheme. Total 53 Schools completed.
Total 42 schools in progress. 22 JB Schools is
target to be covered for providing sanitation facilities during 2004-05 under
SSA. 22 JB schools completed. |
||||||||||
|
6. |
Two
more Residential Schools for tribal students would be set up in Sabroom and
Khowai Sub-Division to offer high standard of education and these Schools
would be managed by the Tripura Tribal Welfare Residential School Society
under the Tribal Welfare Department. |
Foundation
stone has been laid on 10/01/2005 in EMRS at Bhuratali, Sabroom, South
Tripura. Expenditure sanction for Rs.
25.00 lakhs received and has been placed with EE RD, South. Total land measuring 29.49 acres. Work order issued. RD materials booked. |
||||||||||
|
7. |
Coaching
for Joint Entrance Examination will be conducted in all District |
2003-04= No centre
functioned in South Tripura District. |
2004-05= Name of
Centre- Langmani Haduk Society, Udaipur (NGO). No. of students enrolled- 11,
Date of commencement- 01/12/04. Duration of period- 4 months (October 2004 to
January 2005). Approval from TW Deptt received on 16/12/2004. |
|||||||||
|
8. |
One
new ITI shall be opened at Ambassa and the ITI at Jatanbari shall be
upgraded. |
2003-04=
Nil |
2004-05=Land for new construction of ITI Jatanbari has been
handed over to PWD, Amarpur, Division No.1. on 15.10.2004 and the construction work is yet to be started by the concerned Department. |
2005-06= Construction work has not yet been started. |
||||||||
|
9. |
Posting
of adequate number of teachers in all schools in ADC areas will be given
priority. |
Total
– JB School= 350. Total new JB School- 50, No. of Teacher- 1,296 ( Regular- 1205 + Contract basis- 91) , Total
no. of students- 36,121, No. of single teacher in school- 59. |
||||||||||
|
10. |
Literacy
campaign will be activated as a major thrust area for achieving cent percent
literacy among tribal. |
Out of
22,206 ST learners, 16,225 have succeeded.
|
||||||||||
|
A |
B |
C |
||||||||||||||||||||||||||||||||
|
|
HEALTH
|
|||||||||||||||||||||||||||||||||
|
11. |
Construction
of buildings for Health Institutions (PHCs and Sub-Centres) located in tribal
areas will be given priority. Health Deptt. shall taken up construction of
buildings for 10 Institutions each year. |
As reported by CMO, South |
||||||||||||||||||||||||||||||||
|
Year |
Target |
Name of Sub-Centre |
Renovation of bulilding. |
W. in progress |
W. Completed. |
|||||||||||||||||||||||||||||
|
2003-04 |
4 |
i. Sachirambari (BLN) ii.
Shamukcherra (UDP) i. Takmacherra (BLN) ii.
Debipur (BLN). |
- |
- 2 |
2 - |
|||||||||||||||||||||||||||||
|
2004-05 |
2 |
i. Manirambari (BLN) ii.
Dumbur nagar ousted Colony (AMP) i. Karbook PHC (AMP), ii.
Shilachari PHC (SBM), iii. Ompi R/H (AMP) iv. Natunbazar R/H (AMP) |
- 4 |
- 4 W. under progress. |
- - |
|||||||||||||||||||||||||||||
|
2005-06 |
- |
i. Tairupabari (BLN), ii.
Kalachara PHE (SBM) |
2 |
|
|
|||||||||||||||||||||||||||||
|
12. |
At
least 5 local tribal women in each village the TTAADC area shall be given
Dhai training for ensuring safe deliveries. |
As reported by CMO, South |
||||||||||||||||||||||||||||||||
|
Year |
Target |
Achievement
|
Remarke |
|||||||||||||||||||||||||||||||
|
2003-04 |
55 |
- |
Proposal
sent to Director (DHS) Agartala for Dhai training. Approval yet to be
received. |
|||||||||||||||||||||||||||||||
|
2004-05 |
99 |
|
Fund
sanction and distributed towards 10 of selected PHCs under South Tripura for
Dhai training of Tribal Women (5 women from each villages) Total fund
sanction for 100 persons. Training to be completed by March 2005. |
|||||||||||||||||||||||||||||||
|
13. |
Immunization
will be taken up in tribal areas in a big way to achieve 100 percent coverage
among the children and pregnant mothers. |
As
reported by CMO, South |
||||||||||||||||||||||||||||||||
|
Year |
Target |
Name of
Block |
Remarks |
|||||||||||||||||||||||||||||||
|
2003-04 |
4 |
i.
Matabari ii. Sstchand iii. Amarpur iv. Hrishyamukh |
100%
immunization completed. |
|||||||||||||||||||||||||||||||
|
2004-05 |
7 |
i.
Rupaichari ii. Rajnagar, iii. Kakraban, iv. Matabari v. Satchand vi.
Hrishyamukh vii. Amarpur |
100%
immunization completed |
|||||||||||||||||||||||||||||||
|
2005-06 |
4 |
i.
Karbook, ii. Killa, iii. Ompi, iv. Bagafa. |
100%
immunization is going on and will be completed by August 2005 |
|||||||||||||||||||||||||||||||
|
|
INFRASTRUCTURE |
|||||||||||||||||||||||||||||||||
|
14. |
All
the 291 Partially Covered Habitation (P.C. Paras) as on 01/04/2003 in tribal
areas will be upgraded to Fully Covered Habitations (F.C. Paras) by providing
additional sources of drinking water. |
2003-04=
Thiere is no NC/ PC habitation as on 01-04-2004. All are FC habitation. |
Coverage of NC/PC habitations in Tribal areas
during 2004-05. |
|||||||||||||||||||||||||||||||
|
Status of NC/PC habitations in tribal areas after
conducting re-survey of drinking water sources during 2004-05 (in nos.) |
Taken up during 2004-05 (in nos.) |
Converted to FC during 2004-05 (in nos) |
Action plan
during 2005-06 (in nos.) |
|||||||||||||||||||||||||||||||
|
NC |
PC |
|||||||||||||||||||||||||||||||||
|
NC |
PC |
NC |
PC |
Converted |
In prog. |
Converted |
In prog. |
NC |
PC |
|||||||||||||||||||||||||
|
215 |
227 |
125 |
31 |
73 |
52 |
11 |
20 |
90 |
196 |
|||||||||||||||||||||||||
|
15. |
Minimum
40% of new Pipe water supply schemes/Iron Removal Plants shall be taken up in
tribal areas. |
PHE Division
No. III, Udaipur |
PHE, Division no. VII,
Belonia. |
|||||||||||||||||||||||||||||||
|
Year |
Target |
Phy.
Achievement |
Year |
Target |
Phy.
Achievement |
Futher
contemplated 2005-06 |
||||||||||||||||||||||||||||
|
2004-05 |
i.
Pipe water supply- 12.60 KMs ii. Iron Removal plants-10
nos iii. Sinking D.T.W - 24 nos. iv. Over head Tank- 3. |
i.
Pipe water supply- 8.223 KMs ii. Iron Removal plants-6
in progress. iii. Sinking D.T.W – 13
nos. iv. Over head Tank-1 in
progress. |
2004-05 |
i.
Pipe line - Nil ii. Iron Removal plants- 7
nos iii. D.T.W scheme- 25 nos.
iv. Over head Tank-3 nos. |
i. 36,203 Mtrs completed. ii. 7 nos. Work in progress. iii. Production well-13, Abodant-5 iv. Over head Tank-3 Work in progress. |
- - 7 nos. - |
||||||||||||||||||||||||||||
|
16. |
Area Based integrated
projects shall be taken up in minimum 10 identified tribal villages to
accelerate growth. |
4 Spl.
Area Based Projects have been taken up in South Tripura District. Details are
as follows: |
||||||||||||||||||||||||||||||||
|
Sl. No |
Name of
projects |
No. of
targeted families. |
Name of
Sub-Div |
Fund
allotted for Area Based Project (In Rs.) |
Expenditure
(In Rs.) |
|||||||||||||||||||||||||||||
|
1. |
Dakshin
& Uttar Songang |
574 |
AMP |
32,90,125 |
22,16,005 |
|||||||||||||||||||||||||||||
|
2. |
South
Barmura |
595 |
UDP |
23,40,000 |
18,39,880 |
|||||||||||||||||||||||||||||
|
3. |
Laxmichara |
471 |
BLN |
19,60,275 |
18,91,000 |
|||||||||||||||||||||||||||||
|
4. |
Gagan
Chandra Para |
381 |
SBM |
26,75,000 |
20,28,000 |
|||||||||||||||||||||||||||||
|
Total: - |
2,021 |
|
1,02,65,400
|
79,74,885 |
||||||||||||||||||||||||||||||
|
17. |
At
least 5,000 hectares of irrigation potential would be created in tribal areas
through the Minor Irrigation Schemes during the next 4 years. |
Udaipue I & FM 2003-04- 649 Hec |
Belonia I & FM
2003-04 & 2004-05= 1,162 Hect. Covered. (up to Dec
04). |
RD Deptt
2004-05= Target- 1020.70 Hect. |
||||||||||||||||||||||||||||||
|
2004-05 = i.
Total number of LI scheme taken up under TSP of MTB, Killa, AMP, KBK &
Ompi Block- 33 nos. ii.
Commissioned- 17 nos. iii.
Ready for commission- 16 nos. iv. Power connection-2 v. Pipe
line completed- 56.134 KM vi. Land brought under
irrigation-267.00 Hec |
||||||||||||||||||||||||||||||||||
|
A |
B |
C |
|||||||||||
|
18. |
The
Power Deptt would electrify at least 300 backward tribal habitations not
having electricity at present and at least 100 habitations would be covered
by non-conventional source of power by the Science and technology Deptt. |
Power
Deptt. |
Science
& Technology Deptt. |
||||||||||
|
Name of
Division |
Target |
Year |
Name of
village |
Line
parameters |
Status |
Year |
Name of
GP |
No. of
covered family |
Remarks |
||||
|
HT |
LT |
S/S |
2003-04 |
South
Baramura, Killa Block |
230 |
All
these villages are electrified through solar home lighting system |
|||||||
|
EE.
ED-IV, UDP |
3 |
2003-04 |
1.Rathuapara
(Noapitrabari) under Dewanbari (Uttar Brajendranagar) |
3 KM |
1 KM |
1x25 KVA |
Pole
erection Completed |
||||||
|
2.Darlong
Jamatiabaripara (Senaraibari) under Uttar Changang (Tuichakma) |
1.5 KM |
1.5 KM |
1x25 KVA |
Completed |
Darjeeling
Bari, Killa Block |
93 |
|||||||
|
3.
Rambabu Kalaipara (Besreempara) underDakshin Taidu. |
0.3 KM |
1.5 KM |
1x25 KVA |
Completed |
Magroom,
Rupaichari Block |
83 |
|||||||
|
EE.
ED-IV, UDP |
3 |
2004-05 |
1.
Tuibaklaibari (Raiyabari Chaprai) under Uttar Baramura (Raiyabari) |
1.5 KM |
1 KM |
1x25 KVA |
Estimate
is being sent to higher authority for necessary approval |
East
Manu Bankul,. Rupaichari Block |
72 |
||||
|
2.
Chaimani Roy Kaipeng (Ompi Khasrung para)-Regrouping colony under Uttar Taidu |
1.5 KM |
1 KM |
1x25 KVA |
Estimate
is being sent to higher authority for necessary approval |
Bagmara
Rupaichari Block |
51 |
|||||||
|
3.
Bampur Jamatiabari Karfubari IJS colony (Laigiri) under Bampur. |
1.5 KM |
1 KM |
1x25 KVA |
Estimate
is being sent to higher authority for necessary approval |
Kaptali
Rupaichari Block |
137 |
|||||||
|
EE,ED-VI,
Bagafa |
2 |
2004-05 |
1.
Khastilla under Manpathar GP |
- |
- |
- |
Target
of line parameter not yet received. |
Bagachata
Rupaichari Block |
39 |
||||
|
2.
Bagantilla under Kailashnagar GP |
- |
- |
- |
Target
of line parameter not yet received. |
Bishnupur
Rupaichari Block |
36 |
|||||||
|
Taikuma STC Block |
68 |
||||||||||||
|
Ratanmani,
STC Block |
10 |
||||||||||||
|
Betaga
STC Block |
10 |
||||||||||||
|
Habratali
STC Block |
10 |
||||||||||||
|
2004-05 |
Kachigang, Killa |
52 |
These
villages are electrified through Solar Photovoltaic power plant |
||||||||||
|
Colony
Para, STC Block |
46 |
||||||||||||
|
Sen
Chandra Para, RPC Block |
49 |
||||||||||||
|
2005-06-
Target |
|
|
|
||||||||||
|
Dakshin
Baramura/Debtamura R.F. Killa Block. |
600 |
These
villages will be electrified through solar home lighting system |
|||||||||||
|
Kaptali,
RPC Block. |
361 |
||||||||||||
|
Baramura,
Killa Block |
330 |
||||||||||||
|
Jarimura,
Karbook Block |
588 |
||||||||||||
|
Mukchari
Karbook Block |
26 |
||||||||||||
|
Chakpur
Karbook Block |
38 |
||||||||||||
|
A |
B |
C |
|||||||
|
19. |
The
Animal resource Development infrastructure will be strengthened in Tribal
Areas. |
As reported
by Dy. Director, ARDD, South |
|||||||
|
Year |
Target |
Remarks |
|||||||
|
2003-04 |
4
Opening of new Vety First Aid centre. |
4
Opening of new Vtcy First Aid centre and started functioning. Namely- i.
Kaptali VFAC under Rupaichari Block. ii. Takka Tulshi VFAC under Satchand
Block. iii. Pathaimegpara VFAC under Satchand Block iv. Kalacharra VFAC under
Bagafa Block. |
|||||||
|
2004-05 |
6
Proposals for the A.I. coverage VFAC. 1 Opening Block level Vety.
Institution. |
i.
Proposal for the A.I. coverage VFAC- 6 nos. Progress during Awaiting for
approval. Namely- i. Nityabazar (New Centre) under Killa Block. ii. South
Baramura (New Centre) under Killa Block. iii. Karbook under Karbook Block iv.
Atharabhola under Killa Block v. Tainal/ Adipur under Matabari Block vi.
Gamekobari under Amarpur Block. ii.
Opening Block level Vety. Institution at Killa.- 1no. Progress during Awaiting for approval. |
|||||||
|
20. |
Two
Commercial handloom Production Units on loin loom shall be taken up as Pilot
Projects. |
Handloom,
Sericulture & Handicraft based Special SGSY projects were taken up in
Bagafa Block. 400 ST beneficiaries are to be covered. ( 75 Handloom + 250 Sericulture + 75 Handicraft) |
|||||||
|
21. |
All
habitations having at least 250 populations in rural areas will be provided
roads of improved quality by 2007 based on Core road Network Plan. |
Status
reports on Core road Netwoek Plan under South Tripura District. |
|||||||
|
Sl. No |
Name of
road |
Road
number as per core network |
Required
length of road (In KM) |
Habitations
of population 250 and above covered |
Habitations
of population below 250 covered
incidentally (on route) |
Remarks |
|||
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
|||
|
Rupaichari
Block, Sabroom Sub-Division. As
reported by EE, Roads & Building Division (PWD) Sabroom. |
|||||||||
|
1. |
Silachari
Ailmara main road to Anandabandu para |
L 023 |
3.75 |
i. Gajennda Para ii. BSF Camp
iii. Anandabandhu para. |
|
|
|||
|
2. |
Silachari
Ailmara main road to Ramsing para |
L 024 |
0.70 |
i. Ramsing Para |
|
|
|||
|
3. |
Silachari
Ailmara main road to Potachari |
L 025 |
5.25 |
i. Joyanta Para, ii. Akya mog
Para, iii. Mankarbari. |
|
|
|||
|
4. |
Silachari
Ailmara main road to Desharam Khamar para |
L 026 |
3.00 |
i. Desharam Khamar para |
|
|
|||
|
5. |
Silachari
Ailmara main road to Thakia Chow. Para |
L 048 |
1.40 |
i. Thakia Chow. Para |
i. Labrachai Para |
|
|||
|
6. |
Naibodya
para to Asla Ch. Para |
L 041 |
1.40 |
i. Ash Ch. Para |
|
|
|||
|
7. |
Harina
to South Manu Bankul Bazar |
L 044 |
2.00 |
i. South Manu Bankul Bazar |
i. Narayanbari. |
|
|||
|
8. |
Narayanbari.
To Santipalli |
L 045 |
3.10 |
i. Bankul Colony, ii. Santipalli |
i. Nandu Kr. Para, ii. Chota Mog
para, iii. Maever para, iv. Magath para, v. Mongari mog Para, vi. Sudhan
Chow. Para. |
|
|||
|
9. |
Thini
Mog para to Deang Chow Para. |
L 046 |
1.60 |
i. Deang Chow Para, ii. Gobinda
Para |
i. Safru Mog para, ii. Thini Mog
Para. |
|
|||
|
10. |
Harina
Ailmara main road to Mongru Mog Para |
L 049 |
7.85 |
i. Padmalochan para, ii. Chalafru
Mog para, iii. Mongru Mog para |
i. Kirit bahar para, ii. Balidar
para, iii. Sabiram para, iv. Chalai Mog para. |
|
|||
|
11. |
Chalafru
Mog para to ramrai para |
L 050 |
2.20 |
i. Ramrai para |
i. Mongari Mog Para. |
|
|||
|
12. |
Kirit
bahar para to Haridas Para |
L 052 |
2.80 |
i. Haridas Para |
i. Kanya prasad para, ii. Dema
Prasad para. |
|
|||
|
13. |
Harina
Ailmara main road to Jogendra para |
L 056 |
1.00 |
i. Jogendra para |
|
|
|||
|
14. |
Harina
Ailmara main road to Abhi roaja para |
L 057 |
2.75 |
i. Abhi roaja para |
|
|
|||
|
15. |
Harina
Ailmara main road to Kejuri Mog para |
L 058 |
1.00 |
i. Subarna para, ii. Kejuri Mog
para |
|
|
|||
|
16. |
Harina
Ailmara main road to Maria para |
L 059 |
1.00 |
i. Maria para |
i. Ailmara bazar |
|
|||
|
17. |
T02 to
Bagmara para |
L 030 |
1.20 |
i. Bagmara para |
|
|
|||
|
18. |
T02 to
Khirod roaja para |
L 032 |
1.00 |
i. Khirod roaja para |
|
|
|||
|
19. |
Harina
Ailmara main road to Daluchari para |
T 02 |
1.20 |
i. Daluchari para, ii.
Anandabandu para. |
|
|
|||
|
20. |
Baishnabpur
to Beltali |
T 02 |
10.00 |
i. Sidhi Singh para, ii. Beltali |
i. Kukichara, ii. Kassampara,
iii. Trikumarpara,iv. Pitra Chakma para, v. Mongi Mog para, vi. Gugra Para. |
|
|||
|
21. |
Silachari
Ailmara main road to Debendra para |
L 022 |
6.25 |
i. Gunamani para, ii. Mongfru
Mog Para, iii. Debendra para. |
i. Lalit para. |
|
|||
|
Total:- |
60.45
KMs |
|
|
|
|||||
|
A |
B |
C |
||||||
|
|
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
|
Satchand
Block, Sabroom Sub-Division. As reported by EE, Roads & Building Division
(PWD) Sabroom. |
||||||||
|
1. |
US road
(Laban Roaja para) to Kalijoy Roaja para |
L 021 |
5.40 |
i.
Kalijoy Roaja para |
i. Das
para,ii. Ponichandra para, iii. Sadhan Chandra para. |
|
||
|
2. |
US road
(Gariya Sardar para) to Ramjiban para. |
L 022 |
5.30 |
i.
Ramjiban para. |
i. Garya
Sardar para ii. Takun Bazar, iii. Lazmibari para, iv. Hari Das Roaja para, v.
Gukul Roja para |
Brick
soling road as per PWD Tripura specitication without proper C.D.work. |
||
|
3. |
US road
(Kala chara) to Golakhan para |
L 023 |
3.90 |
i. Annadhan para, ii. Golakhan
para |
i.
Gabinda para, ii. Ramkrishna para, iii. Sen chandra para. |
|
||
|
4. |
L 023
(Kalachara to Golakdhan para) to Chagra para |
L 025 |
2.70 |
i.
Kongchai para, ii. Chagra para |
i. Ram Goya
para,ii. Dakshin para, iii. Das para |
|
||
|
5. |
US road
(Near EPM Bazar) to Pathi Mog para |
L 027 |
2.90 |
i. Pathi
Mog para |
|
|
||
|
6. |
US road
(Satchand Block) to Surendra Sarder para. |
L 059 |
4.00 |
i. Surendra Sarder para, ii.
Mougsingh para |
i. Pichan Das para, ii. Mantu
Das Para, iii. Tafmonas para, iv. Nandyran para, v. Dakshin para, vi. Uttar
para, vi. Madhya para, vii. Ratan vadya para, viii. Gakul Roaja para, |
|
||
|
7. |
L 059
(New Manu ONGC coloney to Ratan Vaidya para) to Kabya chow para. |
L 060 |
0.60 |
|
i. Kabya chow.Para, ii. Prassana
roaja para, iii. Binysarkar para, iv. Maniram para, v. Ram ch.para, |
|
||
|
8. |
U.S.
road (Das para) to poang bari. |
L 061 |
4.85 |
i. Krishna Choudhuri para, ii.
Mongsing para, iii. Poang bari. |
i. Ram Guyacolony, ii. Das para,
iii. Dhirendra Nath para, iv. Nath para, v. Sil para, vi. Gardhang para. |
|
||
|
9. |
T
02(Near Joysingh para) to Ramar bari. |
L 047 |
6.20 |
i.
Kaptali Maru Ramar bari. |
i.
Bartilla para, ii. Maru para, |
|
||
|
10. |
L
047(Near panigata para) to Maru para. |
L 044 |
0.60 |
|
i. Maru
para. |
|
||
|
11. |
T
02(Powang bari) to Sarat Chandra para. |
L 048 |
1.80 |
i. Sarat
Chandra Para. |
|
|
||
|
12. |
L
054(Badal sil para) to Arjun prasad para. |
L 056 |
1.60 |
i. Arjun
prasad para, ii.Nitai charar para. |
i.
Basanti para. |
|
||
|
13. |
T
02(Bhudhi Mangal para near Manu hospital) to Rabindra Sardar para, |
L 057 |
1.26 |
i.
Bhudhi Mangal para, ii. Rabindra Sardar para. |
i. Gagan
Bari. |
|
||
|
14. |
U.S.
road(Lalit para Manu bazaar) to Astam sardar para. |
T 03 |
2.85 |
i. Astam
Sardar para. |
i.
Dakhin Manu Shiki Ram para. |
|
||
|
15. |
T
03(Mahimsardar para) to Kakai Mogh para. |
L 053 |
2.75 |
i.
Dinesh Majumder para, ii. Kaki Mog para. |
i. Mahim
sardar para. |
|
||
|
16. |
T
03(Dhupchari) to Mandali para. |
L 042 |
2.85 |
i. Mathu Mog para, ii. Mandali
para. |
i. Dup Charri. |
|
||
|
17. |
T
03(Sikhirampara) to Sabal para. |
L 051 |
4.00 |
i. Nath para, ii. Bipin Sardar
para, iii. Sabal para. |
i. Nul
singh para, ii. Chandi Roaja para, iii. Chan Frau para. |
|
||
|
18. |
U.S.
road(Manughct) to Kushal Ch. Para. |
T 04 |
11.00 |
i. Shyam para, ii. Harbatali
para, iii. Kushal para. |
|
Out of
total 11.ooKm. and 1.5Km. Brick soled as per PWD Tripura spectication.
Estimate sent for 5.9Km. under PMGSY scheme for 2002-03. |
||
|
19. |
T
04(Sadroom Nabin Ch.para) to Banga Mura. |
L 043 |
3.50 |
|
i. Nal charri |
|
||
|
20. |
U.S.
road(Kathal Chari para) to Mog para. |
L 031 |
2.00 |
i. Kathal Charri para, ii.
Dakshin para, iii. Bijoy sil para, iv. Mog para. |
i. West para. |
|
||
|
Total |
70.00
KMs |
|
|
|
||||
|
A |
B |
C |
||||||
|
|
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
|
Bagafa
Block, Belonia Sub-Division. As reported by EE, Southern Division No.-II (PWD) Santirbazar. |
||||||||
|
1. |
T-13(NH-44)
to Tuipang para |
L 021 |
5.00 |
Tuipang Para (P=268) |
i. Nagendra Para(P=100), ii.
Kupilong Noatia Para (P= 217), iii. Saran Kr. D/Barma Para (P=174), iv.
Sachindra Noatia Para (P=103) |
|
||
|
2. |
T-01
(NH-44-Takma road) to Lal Tilla Mog para |
L 023
& L 024 |
3.50 |
i. Lal Tilla Mog para (P=311) |
i. Rabindra Para (P=103) ii.
Bishnu Noatia para (P=140), iii. Karai Ch. Para (P=224) iv. Mahabasi para
(P=130). |
B/S
shown in CN but not as per Specification. |
||
|
3. |
T-01
(NH-44-Takma Road) to Mongshu Mog para. |
L 025 |
3.00 |
i. Monghu Mog para (P=308) ii. Madhu Chakma para (P=305) |
i. Sonatan para (P=86),ii. Guna
Sigh para (P=90) iii. Sambhu Hari para (P=102) iv. Khutum Rai Reang para
(P=114). |
|
||
|
4. |
T-13
(NH-44) to Pati Prasad Para. |
L 029 |
5.00 |
i. Pati Prasad Para (P=302). |
i. Larcha Para (P=184), ii.
Mandata Para(P=215),iii. Gangaria Para (P=188). |
|
||
|
5. |
Pati
prasad para to Tashriaha para. |
L 030 |
2.00 |
i. Tashriaha para (P=533). |
|
|
||
|
6. |
T-02
(A-B Road) Bagafa Ashram Para to Gobin Bari. |
L 035 |
4.00 |
i. Gobin Bari (P=250), ii.
Lankajoy Para (P=297). |
i. Anuram Para(P=244). |
|
||
|
7. |
T-03(Baikhora-Laxmicherra
Road) to Sarbadhan para. |
L 037 |
2.00 |
i. Sarbadhan para (P=250). |
i. Rajendra para (P=33). |
|
||
|
8. |
T-03
(Baikhora-Laxmicherra Road) to Desharai para. |
L 038 |
5.00 |
i. Desharai para (P=279). |
i. BirchandraPara (P=103), ii.
Muktadhan para (P=60), iii. Athoi Mog para (P=101), iv. Chulaibari (P=203). |
2.00Km.
-2.50Km. Brick soled with 3 nos. S.P.T.bridge. |
||
|
9. |
T-03
(Baikhora-Laxmicherra Road) to Gridya Kr. Para. |
L 039 |
8.00 |
i. Gridya Kr. Para (P=250), ii.
Khedachandra para (P=545). |
i. South Binoy Prasad para
(P=116), ii. Raiyabari (P=158), iii. Purbajoy para (P=164), iv. Ganiram para
(P=176), v. Dingha para (P=52), vi. Debendra para (P=95). |
|
||
|
10. |
T-04(Kalshimukh-Kalshi
Road) to Najirai para. |
L 044 |
2.00 |
i. Najirai para (P=355), ii.
Charen para (P=507). |
|
|
||
|
11. |
T-04(Kalshimukh-Kalshi
Road) to Madhumog para. |
L 045 |
2.00 |
i. Madhumog para(P=357). |
i. Puipaha para(P=138). |
|
||
|
12. |
Madhumog
para(Sisarai) to Satarai para. |
L 048 |
1.50 |
i. Satarai para(P=298) |
|
The
connecting road i.e.L 047 with the main road is under const. under PMGSY
scheme during the year 2001-02. |
||
|
13. |
Satarai
para to Sisarai. |
L 049 |
3.00 |
i. Sisarai(P=250) |
|
|
||
|
14. |
Sisarai
to panjirai. |
L 050 |
3.50 |
i. panjirai(P=1005). |
|
|
||
|
15. |
T-05(Jolaibari-Kowaifung
Road) to Rangacherra para. |
L 054 |
1.50 |
i. Rangacherra para (P=756). |
|
|
||
|
16. |
T-05(Jolaibari-Kowaifung
Road) to Rabidhan para. |
L 055 |
7.02 |
i. Rabidhan para(P=289). |
i. Harijoy Colony (P=180). |
|
||
|
17. |
T-05(Jolaibari-Kowaifung
Road) to Patichari. |
L 059
& L 056 |
5.00 |
i. Patichari(P=411). |
i. Shibram Mog para(P=159). |
|
||
|
18. |
L
056(Patichar-Nath para Road) to Shinglufru Mog para. |
L 057 |
1.25 |
i. Shinglufru Mog para (P=338). |
|
|
||
|
19. |
L
056(Patichar-Nath para Road) to Nabaram Para. |
L 058 |
2.00 |
i. Nabaram Para (P=314). |
|
|
||
|
20. |
T
05(Jolaibari-Kowaifung Road) to Chandramal para. |
L 060 |
2.00 |
i. Chandramal para(P=272). |
i. Narad para(P=67) |
Brick
soled shown in CN but not as per specification. |
||
|
21. |
Chandramal
para to Surendra Chow.para. |
L 061 |
5.00 |
i. Surendra Chow.para .(P=281). |
i. Charan Singhpara(P=245), ii.
Arjun Para(P=85), iii. Ananta Sardar para (P=219). |
Brick
soled shown in CN but not as per specification. |
||
|
22. |
T-05(Jolaibari-Kowaifung
Road) to Teja Bari. |
L 062 |
3.00 |
i. Teja Bari (P=497). |
i.Parba Bari(P=135). |
|
||
|
A |
B |
C |
||||||
|
|
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
|
23. |
Teja
Bari to Sukul Bari. |
L 063 |
3.00 |
i. Sukul Bari (P=365). |
i. Rabi Bari(P=76),ii. Sona
Bandhu para(P=39),iii. Gita Mohan para(P=221). |
|
||
|
24. |
T-13(NH-44)
to Durba Ch.Roaja para. |
L 066 |
4.50 |
i. Durba Ch.Para (P=258), ii.
Charfu Mog para(P=303) |
i. Nagendra para(p=116), ii.
Natun Ch. Para(P=134). |
|
||
|
25. |
Durba
Ch.Roaja para to Chelafu Mag para. |
L 067 |
3.00 |
i.Chelafu Mag para(P=301) |
i. Krishnadhan Sardar para
(P=116), ii. Sondhan para (P=69). |
|
||
|
26. |
T-13(NH-44)
to Sachiram para. |
L 068 |
2.50 |
i. Sachiram para (P=574) |
|
|
||
|
27. |
T-13(NH-44)
to Jumirai para. |
L 070 |
3.00 |
i. Jumirai para (P=355) |
i. Ganga Charan para(P=147). |
|
||
|
28. |
| |||||||